Asbestos Removal Case Studies
CASE STUDY 1
|
SITE:
|
The Acute Building
Walsgrave Hospital
Coventry
|
|
CLIENT:
|
Coleman & Co Ltd
|
|
MAIN CONTRACTOR:
|
|
|
VALUE:
|
£1.2 Million
|
|
DURATION:
|
12 Weeks
|
|
|
|
Scope of Works
Following extensive Type 3 surveys and as part of the new £450m regeneration
scheme at Walgrave Hospital, AA Woods were tasked with the removal of asbestos
pipework insulation from some 512 pipework risers, and AIB cladding from 14
service risers over seven floors. Asbestos trained scaffolders were employed
to create bespoke access with the risers. The project was successfully
completed within programme utilising fifty site operatives working seven
days per week for a duration of twelve weeks
CASE STUDY 2
|
SITE:
|
The Cowdray Centre
Cowdray Avenue
Colchester
Essex
|
|
CLIENT:
|
|
|
VALUE:
|
£130K
|
|
DURATION:
|
6 Weeks
|
|
|
|
Scope of Works
The project involved removal of high level asbestos insulation board ceilings to large areas in excess of 1000 sq/mtr throughout
The Cowdray Centre and its water tower. Additional works included the removal and decontamination of the boiler room.
|